Comcor Environmental Limited (Comcor) has numerous on-going
projects from operating landfill gas pumping tests to
operating and maintaining landfill gas utilization plants.
Landfill gas pumping tests are typically operated
for on the order of two to three months in an effort
to determine landfill gas generation rates. These rates
can be used to design a full-scale landfill gas collection
and flaring system and to assess the feasibility of
landfill gas utilization options. Comcor has seen many
projects from the pumping test stage through to design/construction
and ultimately monitoring of the landfill gas collection
and flaring/utilization system.
Below are information sheets for a few of the
projects which Comcor has designed, built and now operates
and maintains: